Setra-system Model 730 User Manual Page 11

  • Download
  • Add to my manuals
  • Print
  • Page
    / 16
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 10
8
5.0 Calibration & Adjustment
5. 1 Checking & Zero Adjustment
After installation on a system, the Model 730 should be zeroed. Figure 7
shows the location of the zero adjustment potentiometer.
Note: Before making adjustments be sure to allow the Model 730 to warm up and
pump down sufficiently to the system base pressure. This time will vary depending
on range and system conductance. A minimum of 15 minutes is suggested.
Use a digital voltmeter to view the signal output of the Model 730. Adjust the
signal output of the Model 730 to be 0.001 to –0.001 V. Make this adjustment
at a pressure at least 1/2 decade below the Model 730’s resolution; e.g., for a
10 Torr FS unit the zero pressure should be less than 5E-5 Torr. For a 1000 Torr
unit, a pressure less than 0.050 Torr is acceptable.
Figure 7 : Location of Calibration Adjustment Potentiometers
5. 2 Span (Full Scale) Adjustment and Calibration
The Zero adjustment is the only adjustment that should be made in the field.
Span (Full Scale) adjustments require a calibrated and certified reference stan-
dard and should only be attempted by qualified personnel. Return the Model
730 to Setra Systems for periodic calibration, Span (Full Scale)
Adjustment and Calibration adjustments and servicing.
0.12
3.05
1.50
38.10
Page view 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16

Comments to this Manuals

No comments